Batching Best Practices

Batching Best PracticesINTRODUCTIONThis intent of this paper is to present a few Best Practices I have discovered over the years that lead to an improved performance of ingredient automation (batching) systems.LOAD CELL INSTALLATIONSite Preparation All mounting surfaces for the base and loading plate must be level. The distance between the mounting surface of the loading plate and base must within 1/32” of the nominal height (for proper elevation of vessel). The Load Cell Assemblies in a system must be level to within +/- 0.5 degrees. When mounting the base plate on concrete, use grout to secure the plate after leveling. A classic 4 bolt system with anchor bolts embedded in the concrete foundation with nuts above and below the sole plate are used for leveling both within the sole plate and between sole plates. Any welding should be done prior to installation of the load cells. Proper drainage should be provided to prevent the load point assembly from standing in water.InstallationAll load cells must be on the same plane (level) within 0.5 degrees of each other (which is approximately an inch over 10 feet). 4-cell systemA …